Ndrekaj Ltd has delivered high-value infrastructure and logistics projects across Southeast Europe, supporting NATO operations, regional power utilities, and civil authorities. Below is a curated record of our engagements.
| Project | Scope | Client | Location | Period | Value |
|---|---|---|---|---|---|
| 65 New Medical Ambulances with Equipment | Procurement & outfitting for NATO ops | NSPA_NATO Support and Procurement Agency | NATO Memebers | May–Aug 2024 | 5,100,000€ |
| Fier-Hoxhare Line 220kV | Installation of poles & conductors | OST sh.a. / LA-OR Ltd | Albania | Oct 2023–May 2024 | 349,000€ |
| Substation Tetova 1 | Electrical works for 110kV line | AD Mepso | North Macedonia | 2022 | 413,000€ |
| Gjadri River Cascade | OHTL 35kV & 110kV construction | SPE Gjader | Albania | 2018–2020 | 1,500,000€ |
| SS Shtip – SS Probishtip 110kV Rehab | Infrastructure upgrade | AD MEPSO | North Macedonia | 2018–2021 | 2,500,000€ |
| OHTL Tower Painting | Protective coating & restoration | CEDIS / Eurozox | Montenegro | 2019–2021 | 1,000,000€ |
| Tower Assembly in Kolasin | Erection of 110kV steel towers | Elektro Team | Montenegro | 2020 | 250,000€ |
| Road Lighting Stoj–Ada | Urban lighting upgrade | Ulcinj Municipality | Montenegro | 2021 | 200,000€ |
| Pinting of the towers 110kv, 220 kv Montenegro | Protective coating & restoration | CEDIS Montenegro | Montenegro | 2021 | 400,000€ |
| Lighting of Tirane – Durres Highway (Part Kashar – Durres) | Albanian Road Authority | Albania | 2005 | ||
| Reconstruction of Prison building 313 in Tirana | Ministry of Justice | Albania | 2014 – 2015 | ||
| Reconstruction of internal roads of the Ishem Municipality | Municipality of Durres | Albania | 2015 | ||
| Supply and installation of two Autotransformers | KESH sh.a. Albania | Albania | 2010–2011 | ||
| New Substation 110/20(10) kV Bajram Curri | OSSH sh.a. Albania | Albania | 2009–2010 | ||
| Relocaton of Overhead Electrical Lines Rreshen–Kalimash Motorway | Albanian Road Authority | Albania | 2006–2008 | ||
| Supply and installation of Equipment for Tirana, Fier, Elbasan | OST sh.a. Albania | Albania | 2010–2013 | ||
| Relocation of HV, MV and LV Overhead Lines in new road Dames–Tepelene | Albanian Road Authority | Albania | 2014–2015 | ||
| Relocation of 110 kV & 20 kV Cables in Shkodra | Albanian Road Authority | Albania | 2012 – 2013 | ||
| MV & LV Network Rehab and 20/0.4kV TP – Bajram Curri | CEZ Shperndarje sh.a | Albania | 2013 | ||
| MV & LV Network Rehab and 20/0.4kV TP – Koplik | OSHEE sh.a. – Albania | Albania | 2013 | ||
| HV, MV & LV Line Relocation – Tirane–Elbasan Road | Albanian Road Authority | Albania | 2012–2017 | ||
| 110 kV South Albania Overhead Line Kelcyre–Permet | OST sh.a. Albania | Albania | 2014-2015 | ||
| Relocation of 110/35/10/0.4 kV Overhead Lines – Fier–Levan Road | Albanian Road Authority | Albania | 2014-2015 | ||
| HV, MV & LV Line Relocation – Memaliaj–Tepelene Road | Albanian Road Authority | Albania | 2014-2015 | ||
| 110 kV South Albania Overhead Line Korce–Erseke,Part 3: Tower 80–Erseke S/S | OST sh.a. Albania Contractor | Albania | 2015 | ||
| 110 kV Memaliaj–Kelcyre Overhead Line, Part 1 – OST Albania | OST sh.a. Albania | Albania | 2015 | ||
| Underground MV & LV Network Upgrade and 20/0.4kV TP–Durres | OSHEE sh.a. – Albania | Albania | 2015 | ||
| 110 kV OHL Connection Babica-Sarande to Himare & Orikum | OST sh.a. Albania | Albania | 2016 | ||
| 35/6 kV Velipoje SS & MV Upgrade — 3 Feeders | OSHEE sh.a. – Albania | Albania | 2016 | ||
| 110/20/6 kV Golem SS Upgrade – Durres | OSHEE sh.a. – Albania | Albania | 2015-2016 | ||
| Maintance of roads | Albanian Road Authority | Albania | 2012-2016 | ||
| Construction of “Arkitekt Kasemi” Road | Municipality of Corovoda | Albania | 2014–2015 |
Provide of 65 (ea) New Civilian Medical Ambulances with Medical Equipment
Project: Provide of 65 (ea) New Civilian Medical Ambulances with Medical Equipment
Client: NSPA_NATO Support and Procurement Agency
Country: NATO Memebers
Year: May 2024-August 2024
Project: Installation of poles and extension of the conductor on the 220kV Fier-Hoxhare line
Project: Installation of poles and extension of the conductors on the 220 kV Fier-Hoxhare line
Client: OST sh.a. Albania
Contractor: LA-OR Ltd
Subcontractor: Ndrekaj Ltd
Country: Albania
Period: October 2023- May 2024
Project: Construction and electrical works for the 110kV line, Substation Vrutok- Substation Tetova 1, With a value of 413,000 Euro.
Project: Construction and electrical works for the 110kV line
Client: AD Mepso, Skopje North Macedonia
Country: North Macedonia
Year: 2022
Substation Vrutok: Substation Tetova 1
Project: Assembly and Erection of the towers in Kolasin, Montenegro, with a value of 250,000.00 Euro.
Investor: Elektro Team Montenegro
Period: 2020.
Project: Painting of the towers 110 kV, 220 kV in the territory of Montenegro with a value of 400,000.00 Euro.
Investor: CEDIS Montenegro.
Contractor: Elektro Team Montenegro
Period: 2021
Project: Lightening of the road Stoj – Ada in Ulcinj, Montenegro with a value of 200,000.00 Euro
Investor: Ulcinj Municipality.
Period: 2021
Project: Construction of new OHTL 35 kV and 110 kV in the cascade of Gjadri river with a value of 1,500,000.00 Euro
Investor: SPE Gjader.
Period: 2018 – 2020.
Project: Rehabilitation of OHTL 110 kV SS Shtip – SS Probishtip in North Macedonia with a value of 2,500,000.00 Euro.
Investor: AD MEPSO, Skopje, North Macedonia
Period: 2018 – 2021.
Project: Painting of the OHTL towers in the territory of Montenegro, with a value of 1,000,000.00 Euro.
Investor: CEDIS Montenegro.
Contractor: Eurozox Doo Montenegro
Period: 2019 – 2021.
Project: Lighting of Tirana – Durres Highway (Part Kashar – Durres)
Project: Lighting of Tirana – Durres Highway (Part Kashar – Durres)
Client: Albanian Road Authority
Period: 2005
Technical Data:
Project: Reconstruction of Prison building 313 in Tirana
Project: Reconstruction of Prison building 313
in Tirana
Client: Ministry of Justice
Period: 2014 – 2015
Technical Data:
Project: Reconstruction of internal roads of the Ishem Municipality
Project: Reconstruction of internal roads of the
Ishem Municipality
Client: Municipality of Durres
Period: 2015
Technical Data:
Project: Supply and installation of two Autotransformers
Project: Supply and installation of two
Autotransformers
Client: KESH sh.a. Albania
Period: 2010 – 2011
Technical Data:
Project: New Substation 110/20(10) kV Bajram Curri
Project: New Substation 110/20(10) kV Bajram
Curri
Client: OSSH sh.a. Albania
Period: 2009 – 2010
Technical Data:
Project: Relocaton of Overhead Electrical Lines Low and Medium Voltage lines (0.4/6/10kV) in Rreshen – Kalimash Motorway
Project: Relocaton of Overhead Electrical Lines Low and Medium Voltage lines (0.4/6/10kV) in Rreshen – Kalimash Motorway
Client: Albanian Road Authority
Contractor: Bechtel-Enka JV
Period: 2006 – 2008
Technical Data:
Project: Supply and installation of Equipment for Tirana 1, Fier and Elbasan 1 Substation
Contracts: • Construction of 35 kV switchgear building at S/S Tirana 1 220/110/35/20 kV
• Construction of 35 kV switchgear and control building at S/S Fier 220/110/35/20 kV
• Civil works in switchyard of S/S Tirana 1 220/110/35/20 kV
• Civil works in switchyard of S/S Fier 220/110/35/20 kV
• Civil works in switchyard of S/S Elbasan 1 220/110/35/20 kV
Client: OST sh.a. Albania
Contractor: Koncar – Power plant and electric traction engineering Inc.
Period: 2010 – 2013
Project: Relocation of HV, MV and LV Overhead Lines in new road Dames – Tepelene
Project: Relocation of HV, MV and LV Overhead
Lines in new road Dames – Tepelene
Client: Albanian Road Authority
Contractor: AEGEK S.A.
Period: 2014 – 2015
Technical Data:
Project: Relocation of 110kV Underground Cable Line from Shkodra 1 S/S to Shkodra 2 S/S and 20kV underground cable line in Shkodra By Pass, 8 (eight) 20kV Feeders
Project: Relocation of 110kV Underground Cable Line from Shkodra 1 S/S to Shkodra 2 S/S and 20kV underground cable line in Shkodra By Pass, 8 (eight) 20kV Feeders
Client: Albanian Road Authority
Contractor: Ing. Claudio Salini Grandi Lavori
S.p.A. & Salvatore Matarrese S.p.A.
Period: 2012 – 2013
Technical Data:
Project: Rehabilitation of MV and LV distribution network, Transformation point 20/0.4kV, in Bajram Curri City.
Project: Rehabilitation of MV and LV distribution
network, Transformation point 20/0.4kV, in
Bajram Curri City.
Client: CEZ Shperndarje sh.a
Period: 2013
Technical Data:
Project: Rehabilitation of MV and LV distribution network, Transformation point 20/0.4kV, in Koplik City.
Project: Rehabilitation of MV and LV distribution
network, Transformation point 20/0.4kV, in
Koplik City.
Client: OSHEE sh.a. – Albania
Period: 2013
Technical Data:
Project: Relocation of HV, MV and LV Overhead Lines in new road Tirane – Elbasan
Project: Relocation of HV, MV and LV Overhead
Lines in new road Tirane – Elbasan
Client: Albanian Road Authority
Contractor: Copri – Aktor
Period: 2012 – 2017
Technical Data:
Project: 110 kV South Albania Overhead Transmission Line 110 kV S.C Kelcyre - Permet.
Project: 110 kV South Albania Overhead Transmission Line 110 kV S.C Kelcyre – Permet. Part 1/2: tower No 1 – tower No 21 (included)
Client: OST sh.a. Albania
Contractor: Energoinvest, d.d. Sarajevo, Bosnia Hercegovina
Period: November 2014 – January 2015
Technical Data:
This section start from SS Kelcyre to tower no.
21. The total length is 7.50 km, single circuit.
ACSR 240/40mm², OPGW 63 mm² with 48 FO.
Included civil works.
Project: Relocation of 110/35/10/0.4 kV overhead lines in New road Fier - Levan (Fier By Pass.
Project: Relocation of 110/35/10/0.4 kV overhead lines in New road Fier – Levan (Fier By Pass.
Client: Albanian Road Authority
Contractor: Serenissima s.r.l.
Period: August 2014 – December 2015
Technical Data: Supply – Installation Testing & Commissioning of
• 2km 110kV OHL, S.C., Lushnje – Fier
• 1.0 km 35kV OHL, Hoxhare – Tafaraj
• 120 pcs poles for MV and LV OHL
• 4.0 km 20kV Underground cable line
• 3.6 km 0.4kV overhead line (ABCCable)
Project: Relocation of HV, MV and LV Overhead Lines in new road Memaliaj - Tepelene
Project: Relocation of HV, MV and LV Overhead
Lines in new road Memaliaj – Tepelene
Client: Albanian Road Authority
Contractor: Vega shpk
Period: 2014 – 2015
Technical Data:
Project: 110 kV South Albania Overhead Transmission Line 110 kV S.C Korce- Erseke, Part 3/3: tower No 80 (included) – S/S Erseke
Project: 110 kV South Albania Overhead Transmission Line 110 kV S.C Korce- Erseke, Part 3/3: tower No 80 (included) – S/S Erseke
Client: OST sh.a. Albania Contractor: Energoinvest, d.d. Sarajevo, Bosnia Hercegovina
Period: June 2015 – September 2015
Technical Data:
This section start from tower no. 80 to SS Erseke. The total length is 12.56 km of conductor and 14.00 km of OPGW, single circuit. ACSR 240/40mm², OPGW 63 mm² with 48 FO.
Project: 110 kV South Albania Overhead Transmission Line 110 kV S.C Memaliaj-Kelcyre
Project: 110 kV South Albania Overhead Transmission Line 110 kV S.C Memaliaj-Kelcyre. Part 1/2: tower No 1 – tower No 35 (included)Client: OST sh.a. Albania
Contractor: Energoinvest, d.d. Sarajevo, Bosnia Hercegovina
Period: January 2015 – May 2015
Technical Data: This section start from SS Memaliaj to tower no. 35. The total length is 11.0 km of conductor and 10.4 km of OPGW, single circuit. ACSR 240/40mm², OPGW 63 mm² with 48 FO. Included civil works.
Project: Upgrade of Underground Medium and Low Voltage Distribution Networks, transformer point 20/0.4kV, Durres
Project: Upgrade of Underground Medium and Low Voltage Distribution Networks, transformer point 20/0.4kV, Durres
Client: OSHEE sh.a. – Albania
Period: June 2015 – September 2015
Technical Data:
Supply – Installation Testing & Commissioning of
• 7 Transformation Points 20/0.4kV,
• 8 Km MV Underground Cable
• 50 km LV Underground and overhead
Cable Line (ABC) 50 km LV
• 45 km coaxial cable
Project: 110 kV South Albania Connection of OHL 110 kV D.C. Babica- Sarande to future SS Himare and SS Orikum
Client: OST sh.a. Albania
Contractor: Energoinvest, d.d. Sarajevo, Bosnia Hercegovina
Period: April 2016 – December 2016
Technical Data: Orikum section Start from existing DC OHL 110kV Babice – Sarande to future SS Orikum. The total length is 3.5km, with double circuit, and 1 (one) OPGW (48FO).
Himara section start from existing DC OHL 110kV Babice – Sarande to future
SS Himare. The total length is 1.5km, with double circuit.
Project: Upgrade of 35/6 kV Velipoje SS, Upgrade of Underground Medium Distribution Networks, 3 (three) feeders.
Project: Upgrade of 35/6 kV Velipoje SS,
Upgrade of Underground Medium Distribution
Networks, 3 (three) feeders.
Client: OSHEE sh.a. – Albania
Period: March 2016 – July 2016
Technical Data:
Upgrading of Velipoja SS with 3 (three) new ougoing feeders (extension of existing section) and 3.5km 20kV underground cable line. 12/20kV cable, 185/25 mm²
Project: Upgrade of 110/20/6 kV Golem SS, in Durres Region
Client: OSHEE sh.a. – Albania
Period: December 2015 – September 2016
Technical Data:
One transformer bay, power transformer 115/20.8/6.3 kV, 31.5 MVA, ONAF. One 20kV section of switchgear, 1 (one) incoming feeder, 6 (six) outgoing feeder, 1 (one) metering and 1 (one) auxiliary transformer feeder. Steel supports structure, Basbar, earthing, power and control cable,lighting, video surveillance system. Control – Protection & Automation Systems. Testing, commissioning and energizing.
Project: Maintence of roads
Contracts:
• Maintence of Berat – Ura e Pirzes Road
• Maintence of Corovode – Ura e Pirzes Road
• Maintence of Berat – Gllave – K/Gllave – Antena Roads
• Maintence of Erseke – Cearshove Road
• Maintence of Tirane – Elbasan Road (72.5km) and secondary roads
Client: Albanian Road Authority
Period: 2012 – 2016
Technical Data:
Project: Construction of “Arkitekt Kasemi” Road
Project: Construction of “Arkitekt Kasemi” Road
Client: Municipality of Corovoda
Period: 2014 – 2015
Technical Data:
Ndrekaj Ltd remains actively engaged in delivering high-performance solutions across power infrastructure, logistics, and clean energy. Below is a list of our ongoing operations across NATO-aligned missions and regional development zones.
| Project | Scope | Client | Location | Duration | Value |
|---|---|---|---|---|---|
| Provision of Power O&M Services | Operations & maintenance of prime power systems | NSPA_NATO Support and Procurement Agency | Camp Bondsteel CBS, Kosovo | 2022–Ongoing | 2,063,350€ |
| Logistics Support for Framework Nations | Integrated support services: cleaning, laundry, logistics ops | NSPA_NATO Support and Procurement Agency | Camp Film City CFC, Kosovo | 2024–Ongoing | 436,340€ |
| Prime Power Provision | Full-cycle prime power delivery and infrastructure | NSPA_NATO Support and Procurement Agency | Camp Novo Selo CNS, Kosovo | 2025–Ongoing | 2,219,900€ |
| Photovoltaic Park Development | Solar design and implementation on industrial site | Private Client | Fllake Zone, Albania | 2025 | 230,000€ |
| Burrel–Bulqizë 110kV Transmission | Pole installation & conductor stringing | LA-OR shpk | Albania | 2024–2025 | 580,302€ |
Project: Provision of Power O&M Services , Camp Bondsteel
Project: Provision of Power O&M Services , Camp Bondsteel
Client: North Atlantic Treaty Organization NATO
Country: Kosovo
Year: 2022-Ongoing
Project: Logistics Support for Framework Nations
Project: Logistics Support for Framework Nations
Client: North Atlantic Treaty Organization NATO
Country: Kosovo
Year: 2024–Ongoing
Project: Provision of Prime Power at Camp Novo Selo, Kosovo
Project: Provision of Prime Power at Camp Novo Selo, Kosovo
Client: NSPA (NATO Support and Procurement Agency)
Country: Kosovo
Year: 2025–Ongoing
Project: Design and implementation of the photovoltaic park in the Fllake industrial zone, on private warehouse land.
Project: Design and implementation of the photovoltaic park in the Fllake industrial zone, on private warehouse land.
Client: Private individual
Country: Albania
Year: 2025
Project: Installation of poles and conductor stringing for the 110kV Burrel–Bulqizë transmission line
Project: Installation of poles and conductor stringing for the 110kV Burrel–Bulqizë transmission line
Client: LA-OR shpk
Country: Albania
Year: 2024–2025
Ndrekaj Ltd continues to expand its mission-critical services through upcoming partnerships with NATO and national infrastructure bodies across Europe. Below is a selection of confirmed future engagements.
| Project | Scope | Client | Location | Status |
|---|---|---|---|---|
| Provision of Generators, UPS & Power Banks | Power Systems Supply | NSPA | NATO Regions | Scheduled |
| Logistics Support – Laundry & Cleaning | Facility Services – Camps Adazi & Ceri | NSPA | Latvia | Scheduled |
| Hybrid Power System Installation | Renewable System Integration – Camp Novo Selo | NSPA | Kosovo | Engineering Phase |
| HVAC System Installation – Camp Novo Selo | Climate Control Infrastructure | NSPA | Kosovo | Scheduled |
| HVAC System Installation – Camp Film City | Climate Control Infrastructure | NSPA | Kosovo | Scheduled |
| HVAC System Installation – Camp Bondsteel | Climate Control Infrastructure | NSPA | Kosovo | Scheduled |
| Helipad Design-Bid-Build | Naval Base Construction – Mari Base | NAVFAC | Cyprus | Design Phase |
| Pole Painting – 110kV Transmission | Protective Coating | HOPS | Croatia | Mobilization Phase |
| OPGW Deployment on 110kV Lines | Fibre Optic Line Installation | HOPS | Croatia | Engineering Phase |
| 400kV Line Erection & Stringing | Transmission Expansion | AD MEPSO | North Macedonia | Site Preparation |
Project: Provision of Generators, UPS & Power Banks
Project: Provision of Generators, UPS & Power Banks
Client: NSPA
Country: NATO Regions
Status: Scheduled
Project: Logistics Support – Laundry & Cleaning
Project: Logistics Support – Laundry & Cleaning
Client: NSPA
Country: Latvia
Status: Scheduled
Project: Hybrid Power System Installation
Project: Hybrid Power System Installation
Client: NSPA
Country: Kosovo
Status: Scheduled
Project: HVAC System Installation – Camp Novo Selo
Project: HVAC System Installation – Camp Novo Selo
Client: NSPA
Country: Kosovo
Status: Engineering Phase
Project: HVAC System Installation – Camp Film City
Project: HVAC System Installation – Camp Film City
Client: NSPA
Country: Kosovo
Status: Scheduled
Project: HVAC System Installation – Camp Bondsteel
Project: HVAC System Installation – Camp Bondsteel
Client: NSPA
Country: Kosovo
Status: Scheduled
Project: Helipad Design-Bid-Build
Project: Helipad Design-Bid-Build
Client: NAVFAC
Country: Cyprus
Status: Design Phase
Project: Pole Painting – 110kV Transmission
Project: Pole Painting – 110kV Transmission
Client: HOPS
Country: Croatia
Status: Mobilization Phase
Project: OPGW Deployment on 110kV Lines
Project: OPGW Deployment on 110kV Lines
Client: HOPS
Country: Croatia
Status: Engineering Phase
Project: 400kV Line Erection & Stringing
Project: 400kV Line Erection & Stringing
Client: AD MEPSO
Country: North Macedonia
Status: Site Preparation